Retrieving RFP details
Release
Close
Iron County
Work includes roadway preparation, asphalt paving, precast concrete culvert installation, traffic control and other incidental items and work.
County Road 124 Paving Project
zip
Pickens County
Road reclamation and rehabilitation.
Bay County
Work includes 29500 LF sediment barrier, 110 EA inlet protection system, 2900 cy regular excavation, 32800 SY 12" type b stabilization (lbr-40), 630 LF pipe culvert, optional material, round, 18" sd (rcp), 430 LF pipe culvert, optional material, round, 18" sd (cmp), 4 EA single post sign, relocate, 3 ea furnish & install stop sign, 180 LF white - 24" wide solid stripe (stop bar). See attached file.
Beaufort County
Work consists of pave approx 0.9 miles of an existing dirt road. This project will involve tasks such as grading, drainage improvements, base preparation, and asphalt paving to bring the road up to county standards.
Release
Sep 23, 2025
Close
Oct 30, 2025