Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: demolition of existing bridge and construction of new 55 foot single-span precast concrete slab beam bridge, approach roadway work, and any incidental work in accordance with the plans and specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the widening of Back Orrville Road and the replacement of a bridge along that section.
Posted Date
Dec 26, 2025
Due Date
Jan 20, 2026
Release: Dec 26, 2025
Close: Jan 20, 2026
This RFP is for the widening of Back Orrville Road and the replacement of a bridge along that section.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the full replacement of bridge and all related work.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
The project includes the full replacement of bridge and all related work.
AvailableWork consists of the replacement of the existing bridge and addressing an existing slope failure. During construction of the bridge, traffic will be maintained using temporary approaches and a temporary bridge structure to the east of the existing bridge and near the slope failure area.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
Work consists of the replacement of the existing bridge and addressing an existing slope failure. During construction of the bridge, traffic will be maintained using temporary approaches and a temporary bridge structure to the east of the existing bridge and near the slope failure area.
AvailableRelease: Dec 26, 2025
Close: Jan 20, 2026
Work includes widening & bridge replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →