Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the replacement of 17 existing sanitary sewer manholes with new precast concrete manholes and associated site work including tree clearing, seeding, sodding, and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of 17 existing sanitary sewer manholes, with new precast concrete manholes. Also included is miscellaneous site work, including but not limited to tree clearing, seeding, sodding, and site restoration. Construction access will require temporary stream crossings that will be removed prior to completion of the project.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Replacement of 17 existing sanitary sewer manholes, with new precast concrete manholes. Also included is miscellaneous site work, including but not limited to tree clearing, seeding, sodding, and site restoration. Construction access will require temporary stream crossings that will be removed prior to completion of the project.
Premium
Access the largest public sector contact database
City of Hobbs (NM) solicits sealed bids to furnish and install Trunk Line F sanitary sewer replacement (Phase 9) in Hobbs, NM. Procurement is for construction/installation of a sanitary sewer trunk line; bids are to be submitted to the City Finance Director and will be publicly opened at City Hall. A pre-bid conference will be held (attendance optional). Contract documents are available free from the City Engineering Department (Tel: 575-397-9232).
Posted Date
Dec 7, 2025
Due Date
Jan 8, 2026
Release: Dec 7, 2025
Close: Jan 8, 2026
City of Hobbs (NM) solicits sealed bids to furnish and install Trunk Line F sanitary sewer replacement (Phase 9) in Hobbs, NM. Procurement is for construction/installation of a sanitary sewer trunk line; bids are to be submitted to the City Finance Director and will be publicly opened at City Hall. A pre-bid conference will be held (attendance optional). Contract documents are available free from the City Engineering Department (Tel: 575-397-9232).
AvailableThe City of Barnesville seeks construction services to install approximately 2,974 linear feet of 21" PVC gravity sewer, additional lengths of ductile iron and PVC sewer mains, construct manholes, and perform related site work. The contract includes requirements for bonds, insurance, Georgia utility contractor licensing, E-Verify registration, and a 240-calendar-day period of performance.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
The City of Barnesville seeks construction services to install approximately 2,974 linear feet of 21" PVC gravity sewer, additional lengths of ductile iron and PVC sewer mains, construct manholes, and perform related site work. The contract includes requirements for bonds, insurance, Georgia utility contractor licensing, E-Verify registration, and a 240-calendar-day period of performance.
AvailableWork consists of sewer improvements, includes 380 LF of 21" pvc (ps115) sanitary sewer pipe; 1,209 LF of 21" pvc (ps115) sanitary sewer pipe; 152 LF of 20" dip (class 250) sanitary sewer pipe; 3,673 LF of sanitary sewer video inspection (post construction); 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru consolidated rock - includes ductile iron carrier pipe; 1,000 TON of trench stabilization; 600 CY of rock removal base cost; 504 SY of class "a" pavement replacement; 68 SY of gravel to replace asphalt (sheet 9); 3,504 LF of mulching and grassing; 8,034 LF of silt fence - type c; 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru soil & friable weathered rock - includes ductile iron carrier pipe (in lieu of item 19).
Posted Date
Nov 20, 2025
Due Date
Jan 7, 2026
Release: Nov 20, 2025
Close: Jan 7, 2026
Work consists of sewer improvements, includes 380 LF of 21" pvc (ps115) sanitary sewer pipe; 1,209 LF of 21" pvc (ps115) sanitary sewer pipe; 152 LF of 20" dip (class 250) sanitary sewer pipe; 3,673 LF of sanitary sewer video inspection (post construction); 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru consolidated rock - includes ductile iron carrier pipe; 1,000 TON of trench stabilization; 600 CY of rock removal base cost; 504 SY of class "a" pavement replacement; 68 SY of gravel to replace asphalt (sheet 9); 3,504 LF of mulching and grassing; 8,034 LF of silt fence - type c; 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru soil & friable weathered rock - includes ductile iron carrier pipe (in lieu of item 19).