Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of approx. 1,530 TON of gravel borrow incl. export (2-03.5); 264 LF of 12" PVC pipe full replacement (7-08.5); 861 LF of sewer flushing and testing (7-17.5); 200 TON of crushed surfacing base course (4-04.5); 400 TON of HMA CL. 3/8" PG 64-28 (5-04.5); see outside link for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project is for the installation of HDPE pipe via the pipe bursting method of approx. 1,000 LF of existing 8" sewer along the 600 block of Lexington Avenue and 1st Street between Lexington Avenue and Holland Avenue, manhole rehabilitation of three (3) manholes, reconnection and replacement of sewer services and pavement restoration, located in the Avenues subdivision of Cayce.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
The project is for the installation of HDPE pipe via the pipe bursting method of approx. 1,000 LF of existing 8" sewer along the 600 block of Lexington Avenue and 1st Street between Lexington Avenue and Holland Avenue, manhole rehabilitation of three (3) manholes, reconnection and replacement of sewer services and pavement restoration, located in the Avenues subdivision of Cayce.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Work on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
AvailableWork includes capital improvement.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Work includes capital improvement.
AvailableThe City of Cayce is soliciting bids to rehabilitate approximately 1,000 feet of 8-inch sanitary sewer along the 600 block of Lexington Avenue and 1st Street, including pipe bursting with HDPE, manhole rehabilitation, and pavement restoration. The project is funded in whole or in part by the Lexington County Community Development Block Grant (CDBG) program and must comply with federal requirements such as Davis‑Bacon and Section 3. Bids are due by 2:00 PM on January 27, 2026 at Cayce City Hall.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
The City of Cayce is soliciting bids to rehabilitate approximately 1,000 feet of 8-inch sanitary sewer along the 600 block of Lexington Avenue and 1st Street, including pipe bursting with HDPE, manhole rehabilitation, and pavement restoration. The project is funded in whole or in part by the Lexington County Community Development Block Grant (CDBG) program and must comply with federal requirements such as Davis‑Bacon and Section 3. Bids are due by 2:00 PM on January 27, 2026 at Cayce City Hall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.