Retrieving RFP details
Release
Close
City of Cortez
Project consists of the construction of new asphalt apron located on the southwest side of the existing asphalt apron. In addition to the new asphalt pavement, this project will include the demolition and installation of a new underdrain system, removal of an existing drainage structure, extension of stormwater pipe, installation of aircraft tie downs, the removal and installation of new retroreflective markers, replacement of an existing electrical handhole, and pavement markings. See outside link.
Town of Elkin
Apron expansion includes, sediment basins for primary erosion control, approx. 58,000 CY of embankment in place, approx. 1,200 LF of storm pipe, approx. 2,300 CY of crushed aggregate base course, and approx. 2,300 TN of asphalt surface course (S9,5B). Partial parallel taxiway includes, sediment basins for primary erosion control, approx. 57,000 CY of embankment in place, approx. 1,500 LF of storm pipe, approx. 2,100 CY of crushed aggregate base course, approx. 2,100 TN of asphalt surface course (S9,5B), and edge lighting / signage for the new partial parallel taxiway system.
City of Aztec
Provide engineering services, for municipal airport.
City of Palmer
Determine the fair market rental value of the rental properties by comparing the palmer municipal airport to similar aviation properties serving the same functions throughout the state. These are some of the key factors that should be used, but are not limited, to identify comparable properties/airports for use in this comparison: a. Size of the metropolitan area and population; b. Location of the airport; c. Airport classification, size, and function. (Should be limited to General Aviation only); d. Number of operations and other activity statistics; e. Number of based aircraft; f. Local property values; g. Other factors necessary to provide an accurate appraisal. See attached file.
Release
Oct 23, 2025
Close
Nov 20, 2025