Summary
The project consists of approx. 9.1 acres of developed property west of the Fixed Based Operator (FBO) and has a taxi lane on the western portion running alongside of the parcel for access to adjoining parcels with corporate hangars for ADG-III to IV aircraft. The site has multiple connecting existing hangars which the airport looks to redevelop. Proposals should provide programmatic details for redeveloping the existing site and providing a schematic design concept for development of a corporate hangar or hangars for as a corporate campus to house Airplane Design Group (ADG)-III to IV aircraft (Gulfstream 6 or Global Express, for example). The existing hangars should be demolished as part of the proposed development scope of work. The proposed project shall include but is not limited to proposed project design, construction, management, operation and maintenance of an aircraft hangar/hangar complex and must include the most current hangar structure technology and all details regarding the proposed hangar structure.