Summary
Control valve install. Extraction and Injection Well Scope: This is an overview of the items required to complete the extraction and injection well installation: Extraction well pump / motor and piping installation, Extraction well level transmitter and spare (for manual measurements) conduit installation with well piping, Extraction well pump / motor VFD procurement, Extraction well and injection well level and temperature transmitters procurement, VFD installation, VFD power and controls, Geothermal Heat System discharge pressure transmitter procurement, Geothermal Heat System discharge pressure transmitter and associated hardware installation and wiring to downhole control panel, Installation and wiring of extraction well level / temperature transmitter to downhole control panel, Installation and wiring of injection well level / temperature transmitter to downhole control panel, Install Owner supplied downhole control panel, Supply power, controls and communications as shown or mentioned in this scope to the downhole control panel, Owner supplied downhole control panel drawings, Install extraction well and injection well conduits. Coordinate with Owner for locations of existing conduits to extend, Install injection valve (with the assistance of downhole valve manufacturer), hydraulic hosing to surface, Injection well level transmitter and spare (for manual measurements) conduit installation with well piping, Assist with installation of downhole hydraulic hose from mechanical room to injection well head.