Summary
Approx. 3,267 SF Install 4" Concrete Sidewalks per plan details to
include grading and preparation, reinforcement, materials, saw cutting, joint sealant; 560 SF Install 5" Concrete Pavement per plan details to include all reinforcement, materials, saw cutting, joint sealant; Perform fine grading and furnish and install seeding (Bermuda) upon completion of concrete placement; Provide and Install sidewalk drains to include all materials Equipment, and labor; Provide and Install steel painted park benches to include all materials, labor, and equipment needed for installation in accordance with the plans; Provide and Install Signage and Striping for ADA Parking;