Summary
Contract #2 water wells test hole drilling and construction of 2 gravel pack water wells with surface casing and pump and steel pump column piping, contract time 100 calendar days. Contract #3 water storage tower-construction of a 15' x 100' steel water storage tower with concrete foundation, contract time 200 calendar days. Contract #4 well houses-construction of 2 concrete floor, concrete block, concrete roof well houses with all electrical, and piping, gravel roads and chain link fence. Contract time 85 calendar days. Contract #5 telemetry, satellite telemetry to control the pumps and tower level. Contract time 40 calendar days.