Summary
Work consists of the installation of a new 100 hp submersible well pump and transmitter, yard piping improvements, and abandonment and capping of wells 2 & 3 including removal of the pump, column pipe, level element, and wellhead at the taylor well site in brunswick, maine. The project also consists of a new control panel, removal and replacement of two variable frequency drives, two new sine wave filters, installation of 12-inch raw water flow meter and associated process piping, and pressure transmitter assembly at the taylor station water treatment facility. Electrical site work will include demolition of existing underground power/control conduit from taylor station to the taylor well site, and new power and control conduit and wire.