Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of replacement of existing sewer lift station #1, including new submersible pump installation, wetwell, valve vault, temporary by-pass pumping operations, electrical improvements, stand-by generator, abandonment & removal of existing lift station components, fencing, and all other necessary accessories and appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Remove and replace three (3) vacuum prime pump station including controls, piping, and appurtenances. Corrosion protective coating of existing wet wells. Install new 5' diameter wet well and vacuum prime lift station. Replace two (2) submersible pumps, controls, and electrical at primary lift station.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Remove and replace three (3) vacuum prime pump station including controls, piping, and appurtenances. Corrosion protective coating of existing wet wells. Install new 5' diameter wet well and vacuum prime lift station. Replace two (2) submersible pumps, controls, and electrical at primary lift station.
AvailablePremium
Access the largest public sector contact database
The City of Duluth is soliciting bids for rehabilitation of Lift Station 27, Lift Station 40, and Lift Station 3, covering civil engineering and construction work. Bids are due 2025-12-18 and the posting was listed active as of 2025-11-21.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The City of Duluth is soliciting bids for rehabilitation of Lift Station 27, Lift Station 40, and Lift Station 3, covering civil engineering and construction work. Bids are due 2025-12-18 and the posting was listed active as of 2025-11-21.
AvailableWork includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
AvailableRFP for the construction of Wastewater Collection System Improvements, Contract 3 - Lift Station #3 & #4 Rehabilitation.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
RFP for the construction of Wastewater Collection System Improvements, Contract 3 - Lift Station #3 & #4 Rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis