Summary
The specific work includes installing a steel sheet pile wall with concrete cap at the edge of the water to act as a new retaining wall in two areas of the site: an approx. 75 F length of sheet in the vicinity of the WYC club house and an approximate 150 F length at the eastern limits of the site. The steel sheets shall be installed on the water side of the existing block retaining wall which shall remain in place. The area between the existing block retaining wall and the new sheet pile wall shall be filled and compacted with gravel. Additional work includes installing new wire fencing, removing and reinstalling exterior electric lighting and receptacles, and other related items.