Summary
Work includes 500 CY excavation for drainage swales and site grading, including stripping of six inches (6") depth of topsoil and removal of vegetation, as directed by engineer. Stockpile strippings and spread evenly for turf establishment; 70 CY excess utility excavation material to be spread and compacted (to 95%) on site per final grading plan, as directed by engineer; 107 LF (24") di storm sewer including bedding and backfill and connections to existing junction boxes; 130 SY 6" reinforced concrete pavement, complete in place; 10 SY 4. 5"reinforced concrete sidewalk, complete in place. See attached file.