Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of West Tawakoni
Project consists of furnishing and installing one new 1,050 gpm raw water vertical turbine pump and approximately 80 lf of 8-inch waterline with associated valves and appurtenances
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of West Tawakoni
The City of West Tawakoni is soliciting sealed bids for the Headworks Intake Pump project, which includes furnishing and installing a new 1,050 gpm raw water vertical turbine pump and approximately 80 linear feet of 8‑inch waterline with associated valves and appurtenances. Bids are due by 2:00 PM CST on December 8, 2025, at West Tawakoni City Hall.
Posted Date
-
Due Date
Dec 8, 2025
City of West Tawakoni
Close: Dec 8, 2025
The City of West Tawakoni is soliciting sealed bids for the Headworks Intake Pump project, which includes furnishing and installing a new 1,050 gpm raw water vertical turbine pump and approximately 80 linear feet of 8‑inch waterline with associated valves and appurtenances. Bids are due by 2:00 PM CST on December 8, 2025, at West Tawakoni City Hall.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Umatilla
Project proposes the construction of a new raw river water intake pump station/POD, and the portion of the new raw water transmission main on USACE property conveying raw water to the new WTF. Also included is the installation of fiber optic cables from the POD to the WTF within conduit installed as part of this project, as part of the pipeline construction project, and as part of the WTF construction contract. The major components of the project include: 1.Construction of a pump station (POD) including pumps, fish screens, a hydropneumatic surge tank, 2.Construction of approximately 340 feet of 30" and 36" diameter pipeline from the pump station to the property line, and 3.Demolition of the existing CTUIR pump station and pipeline. Adjacent projects designed by others will be constructed in tandem with this project, coordination of construction schedules and scope connections will be required.
Posted Date
Oct 28, 2025
Due Date
Dec 4, 2025
Release: Oct 28, 2025
City of Umatilla
Close: Dec 4, 2025
Project proposes the construction of a new raw river water intake pump station/POD, and the portion of the new raw water transmission main on USACE property conveying raw water to the new WTF. Also included is the installation of fiber optic cables from the POD to the WTF within conduit installed as part of this project, as part of the pipeline construction project, and as part of the WTF construction contract. The major components of the project include: 1.Construction of a pump station (POD) including pumps, fish screens, a hydropneumatic surge tank, 2.Construction of approximately 340 feet of 30" and 36" diameter pipeline from the pump station to the property line, and 3.Demolition of the existing CTUIR pump station and pipeline. Adjacent projects designed by others will be constructed in tandem with this project, coordination of construction schedules and scope connections will be required.
AvailableTown of Taos
The Town of Taos (via the New Mexico SPD) posted a sole source procurement to purchase a replacement submersible grit pump for the Headworks/MBR system at the wastewater treatment plant. The notice lists a start date of 2025‑11‑04 and a due date of 2025‑12‑05, with an amount of $54,190.35.
Posted Date
Nov 4, 2025
Due Date
Dec 5, 2025
Release: Nov 4, 2025
Town of Taos
Close: Dec 5, 2025
The Town of Taos (via the New Mexico SPD) posted a sole source procurement to purchase a replacement submersible grit pump for the Headworks/MBR system at the wastewater treatment plant. The notice lists a start date of 2025‑11‑04 and a due date of 2025‑12‑05, with an amount of $54,190.35.
AvailableForsyth County
Water intake contract B tunnels, shafts, and intake structure. Rock Tunnel and Shaft Construction - Includes construction of the pump station tunnel, pump station shaft, and intermediate shaft. Rock tunneling methods, including drilling and blasting, are required to construct the tunnel and shafts. Permanent linings will be installed in the pump station shaft and pump station tunnel. Microtunnel Construction - Microtunneling is planned to construct the intake tunnel. Intake Structure Construction - The intake structure will be constructed in Lake Sidney Lanier. The work will involve various underwater construction processes.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
Forsyth County
Close: Dec 18, 2025
Water intake contract B tunnels, shafts, and intake structure. Rock Tunnel and Shaft Construction - Includes construction of the pump station tunnel, pump station shaft, and intermediate shaft. Rock tunneling methods, including drilling and blasting, are required to construct the tunnel and shafts. Permanent linings will be installed in the pump station shaft and pump station tunnel. Microtunnel Construction - Microtunneling is planned to construct the intake tunnel. Intake Structure Construction - The intake structure will be constructed in Lake Sidney Lanier. The work will involve various underwater construction processes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →