Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation requests construction of an approximately 1,700 square foot equipment storage building at Dismal Swamp State Park that will include five open-air bays with gravel and electrical services. The work must comply with North Carolina Building and ADA codes and is being managed by the State's construction procurement office in coordination with the Department of Natural and Cultural Resources, Division of Parks and Recreation. The estimated value range shown on the aggregator is $150,000–$300,000 and the contract period begins on award and will be completed per project specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The North Carolina Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting Statements of Qualifications for a designer to provide design and construction administration for a new ~1,700 SF equipment storage building with five open-air bays and electrical services at Dismal Swamp State Park in Camden County. The project will meet NC Building and ADA codes and has a total budget of $530,000 funded by the Parks And Recreation Trust Fund (PARTF). This is a Request for Qualifications (procurement), not a grant, and the solicitation is currently open with a close date of 2026-01-16.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
The North Carolina Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting Statements of Qualifications for a designer to provide design and construction administration for a new ~1,700 SF equipment storage building with five open-air bays and electrical services at Dismal Swamp State Park in Camden County. The project will meet NC Building and ADA codes and has a total budget of $530,000 funded by the Parks And Recreation Trust Fund (PARTF). This is a Request for Qualifications (procurement), not a grant, and the solicitation is currently open with a close date of 2026-01-16.
AvailableUnless otherwise specified by the Refuge Manager or representative, the contractor shall chip/masticate all cut and bundled stems using low ground pressure equipment within the unit. Woody debris should be chipped/masticated and distributed evenly throughout the stand to the greatest extent possible. Protecting the large-diameter residual pines (>15” DBH) from damage is high priority and will have a compaction-free buffer area of 20’ radius from tree center to the greatest extent possible. In addition to the large-diameter pines, all residual trees should be free of damage from the operation of equipment to the greatest extent possible. Contractor shall avoid damaging the root mat and bole of any known red-cockaded woodpecker (RCW) trees (typically marked with numbered tags and white paint); these trees are considered potential nest sites and protected under the Endangered Species Act. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Construct a 12,000 SF storage building consisting of four (4) enclosed storage bays and eight (8) open storage bays.
Posted Date
Oct 18, 2025
Due Date
Jan 12, 2026
Release: Oct 18, 2025
Close: Jan 12, 2026
Construct a 12,000 SF storage building consisting of four (4) enclosed storage bays and eight (8) open storage bays.
AvailableStafford building major electrical upgrade - construction)
Posted Date
Oct 27, 2025
Due Date
Dec 16, 2025
Release: Oct 27, 2025
Close: Dec 16, 2025
Stafford building major electrical upgrade - construction)
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Unless otherwise specified by the Refuge Manager or representative, the contractor shall chip/masticate all cut and bundled stems using low ground pressure equipment within the unit. Woody debris should be chipped/masticated and distributed evenly throughout the stand to the greatest extent possible. Protecting the large-diameter residual pines (>15” DBH) from damage is high priority and will have a compaction-free buffer area of 20’ radius from tree center to the greatest extent possible. In addition to the large-diameter pines, all residual trees should be free of damage from the operation of equipment to the greatest extent possible. Contractor shall avoid damaging the root mat and bole of any known red-cockaded woodpecker (RCW) trees (typically marked with numbered tags and white paint); these trees are considered potential nest sites and protected under the Endangered Species Act. See attached file.
Available