Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Middlesex County
Construction of a side slope final closure, appurtenances and associated site improvements over approx. 23.6 acres at the Landfill, as well as the restoration and reconstruction of two (2) existing downchutes at the closed portion of the landfill.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bedford County
Construction of the final cover system for Phase I Cells A, B, and C on approx. 25 acres at the Bedford County Landfill.
Posted Date
Nov 30, 2025
Due Date
Dec 18, 2025
Release: Nov 30, 2025
Bedford County
Close: Dec 18, 2025
Construction of the final cover system for Phase I Cells A, B, and C on approx. 25 acres at the Bedford County Landfill.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Mendocino
Work includes 12,500 CY relocation of excavated waste from refuse limit potholing and clean closure aera to reconsolidation area; 22,500 CY unclassified fill/foundation fill soil material (19,600 CY + 2,300 CY to make grades); 305,000 SF foundation soil layer placement; 18,500 CY unclassified excavation; 6,200 CY import soil material; 212,000 SF 60 mil lldpe super grip net geomembrane-slope (per detail 1/d1); 84,000 SF 60 mil lldpe super grip net geomembrane-deck (per detail 2/d1). See attached file.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
County of Mendocino
Close: Jan 15, 2026
Work includes 12,500 CY relocation of excavated waste from refuse limit potholing and clean closure aera to reconsolidation area; 22,500 CY unclassified fill/foundation fill soil material (19,600 CY + 2,300 CY to make grades); 305,000 SF foundation soil layer placement; 18,500 CY unclassified excavation; 6,200 CY import soil material; 212,000 SF 60 mil lldpe super grip net geomembrane-slope (per detail 1/d1); 84,000 SF 60 mil lldpe super grip net geomembrane-deck (per detail 2/d1). See attached file.
AvailableCounty of Mendocino
Work includes 12,500 CY relocation of excavated waste from refuse limit potholing and clean closure aera to reconsolidation area; 22,500 CY unclassified fill/foundation fill soil material (19,600 CY + 2,300 CY to make grades); 305,000 SF foundation soil layer placement; 18,500 CY unclassified excavation; 6,200 CY import soil material; 212,000 SF 60 mil lldpe super grip net geomembrane-slope (per detail 1/d1); 84,000 SF 60 mil lldpe super grip net geomembrane-deck (per detail 2/d1). See attached file.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
County of Mendocino
Close: Jan 15, 2026
Work includes 12,500 CY relocation of excavated waste from refuse limit potholing and clean closure aera to reconsolidation area; 22,500 CY unclassified fill/foundation fill soil material (19,600 CY + 2,300 CY to make grades); 305,000 SF foundation soil layer placement; 18,500 CY unclassified excavation; 6,200 CY import soil material; 212,000 SF 60 mil lldpe super grip net geomembrane-slope (per detail 1/d1); 84,000 SF 60 mil lldpe super grip net geomembrane-deck (per detail 2/d1). See attached file.
AvailableSpotsylvania County
Provide construction services related to landfill sanitary cell IID alpha construction.
Posted Date
Dec 2, 2025
Due Date
Jan 28, 2026
Release: Dec 2, 2025
Spotsylvania County
Close: Jan 28, 2026
Provide construction services related to landfill sanitary cell IID alpha construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →