Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a 500 GPM water well & appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Naval Research Laboratory is seeking potential sources for the demolition and construction of a drinking water well at the NRL Pomonkey Facility in Maryland. The project involves the decommissioning of an old well and the construction of a new well, including the installation of a pump, pressure tanks, and piping. The contractor will be responsible for obtaining all necessary permits and complying with federal, state, and local regulations.
Posted Date
Dec 11, 2025
Due Date
Dec 25, 2025
Release: Dec 11, 2025
Close: Dec 25, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Naval Research Laboratory is seeking potential sources for the demolition and construction of a drinking water well at the NRL Pomonkey Facility in Maryland. The project involves the decommissioning of an old well and the construction of a new well, including the installation of a pump, pressure tanks, and piping. The contractor will be responsible for obtaining all necessary permits and complying with federal, state, and local regulations.
Construction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Construction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
AvailableProvide all necessary labor, equipment, parts and supplies to: Demolition / Decommission: Decommission old well as required by Maryland state regulations, to include filling of old well with dry bentonite and properly cap or seals as per local state requirements. Prepare Water Well Abandonment-Sealing Report. Remove existing pump, pressure tanks, associated pipe connection and any device related to the existing well operation. Properly dispose any material. Remove electrical connection back to point of connection. Existing well cannot be demolish and disconnected from the water distribution system until the new well is ready to be connected to the existing water distribution. See attached file.
Posted Date
Oct 30, 2025
Due Date
Dec 25, 2025
Release: Oct 30, 2025
Close: Dec 25, 2025
Provide all necessary labor, equipment, parts and supplies to: Demolition / Decommission: Decommission old well as required by Maryland state regulations, to include filling of old well with dry bentonite and properly cap or seals as per local state requirements. Prepare Water Well Abandonment-Sealing Report. Remove existing pump, pressure tanks, associated pipe connection and any device related to the existing well operation. Properly dispose any material. Remove electrical connection back to point of connection. Existing well cannot be demolish and disconnected from the water distribution system until the new well is ready to be connected to the existing water distribution. See attached file.
AvailableWork includes construction of the water, sanitary sewer, and drainage facilities & paving and appurtenances
Posted Date
Dec 2, 2025
Due Date
Jan 9, 2026
Release: Dec 2, 2025
Close: Jan 9, 2026
Work includes construction of the water, sanitary sewer, and drainage facilities & paving and appurtenances
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →