Summary
Work includes 30 LF removal of pipe, (all sizes); 1,133 CY unclassified excavation (FM); 210 CY borrow excavation (contractor-furnished)(fme)(class 9); 1,119 CY structure excavation; 468 SY geotextile fabric stabilization, type iii, non-woven, aos < 0.43; 1 EA temporary stream diversion; 311 TN crushed stone, size #57; 505 TN crushed stone, size #610; 129 LF 18" reinforced concrete pipe, class iii; 1 EA 18" branch connection (RCP to wingwall of box); 12 EA right-of-way markers (type ii); 1 LS maintenance of traffic; 0.220 TN commercial fertilizer; 0.580 AC seeding; 1.150 TN vegetative materials for mulch.