Summary
Provide construction manager at risk (CMAR) services for the construction of the home side reconstruction project. The project consists of construction of a new three-story home-side stadium structure, including but not limited to: structural steel and concrete stadium structure, new bleacher system, press box, suites, concessions, locker rooms, restrooms, elevator, av and scoreboard integration, associated mechanical, electrical, and plumbing systems, required site improvements and utility coordination. The CMAR shall: provide detailed constructability reviews; develop cost estimates and cost models; perform value engineering analysis.