Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construct ground based strategic deterrent consolidated maintenance facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project will construct a single story flight simulator facility with a high bay section for simulator equipment and an adjacent second story control room area. Construction includes drilled pier concrete foundation, steel frame structure, metal roof, concrete masonry unit exterior walls, back-up power, painting, and surface prep. Special foundation due to local soils, ICD 705 premium due to B-21 program special access requirements covering a large portion of the facility. Utilities include domestic water, electrical, sanitary sewer, and gas. Communications include ducted connects from the building to main distribution infrastructure. Site improvements include earthwork, landscaping, and exterior lighting. Pavements include parking, sidewalks, and roadways. Passive force protection includes standard berms, ditches, and bollards. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of Defense Minimum Antiterrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems.
Posted Date
Jun 24, 2025
Due Date
Nov 2, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jun 24, 2025
Close: Nov 2, 2026
This project will construct a single story flight simulator facility with a high bay section for simulator equipment and an adjacent second story control room area. Construction includes drilled pier concrete foundation, steel frame structure, metal roof, concrete masonry unit exterior walls, back-up power, painting, and surface prep. Special foundation due to local soils, ICD 705 premium due to B-21 program special access requirements covering a large portion of the facility. Utilities include domestic water, electrical, sanitary sewer, and gas. Communications include ducted connects from the building to main distribution infrastructure. Site improvements include earthwork, landscaping, and exterior lighting. Pavements include parking, sidewalks, and roadways. Passive force protection includes standard berms, ditches, and bollards. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of Defense Minimum Antiterrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems.
AvailableRelocatable facility. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform installation of a new 4,032 SF Relocatable Facility (RLF).
Posted Date
Dec 4, 2025
Due Date
Dec 12, 2026
Release: Dec 4, 2025
Close: Dec 12, 2026
Relocatable facility. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform installation of a new 4,032 SF Relocatable Facility (RLF).
AvailableA contract for base alarm services. Base Alarm requirement will provide a service to perform maintenance and repair on the current bases alarm system and CCTV system. This will include cleaning, scheduling, repairing, planing and or replacement of base alarm, access control readers, workstations and various types of surveillance equipment to insure Air Force requirements are met. Additionally, contractor shall maintain the the VPN which currently is part of the base network backbone, this requires network troubleshooting experience, testing and evaluating the current condition or state of the VPN, the ability to utilizing network test equipment for measuring voltages and frequencies on the network. The service will also require a good degree of network experience on IP configurations for surveillance equipment and alarm system components. This includes Fiber, Network switches (CISCO), Network video reorders, media converts, and LPR technology.
Posted Date
Dec 5, 2025
Due Date
Feb 3, 2026
Release: Dec 5, 2025
Close: Feb 3, 2026
A contract for base alarm services. Base Alarm requirement will provide a service to perform maintenance and repair on the current bases alarm system and CCTV system. This will include cleaning, scheduling, repairing, planing and or replacement of base alarm, access control readers, workstations and various types of surveillance equipment to insure Air Force requirements are met. Additionally, contractor shall maintain the the VPN which currently is part of the base network backbone, this requires network troubleshooting experience, testing and evaluating the current condition or state of the VPN, the ability to utilizing network test equipment for measuring voltages and frequencies on the network. The service will also require a good degree of network experience on IP configurations for surveillance equipment and alarm system components. This includes Fiber, Network switches (CISCO), Network video reorders, media converts, and LPR technology.
DESIGN BUILD: The anticipated scope may include, but is not limited to, the following: Phase I: Includes airfield apron construction; grading and drainage; installation of a jet blast deflector; development of water storage, pump stations, and a communication node; roadway construction; upgrades and relocations to existing utilities; construction of aircraft parking and maintenance facilities, including a maintenance hangar and squadron operations facility; development of a flight simulator facility and an avionics re-programming laboratory; and associated design input and management. Phase II: Includes construction of a fuel cell facility; a low-observable (LO) corrosion control facility and wash rack; a consolidated maintenance facility; a maintenance training facility; a fuel station; and a weapons storage facility, along with associated design input and management. Phase III: Includes expansion of the R-11 fuel stand; construction of a satellite dining facility; a DFAC storage facility; a 240-personnel dormitory; and associated design input and management.
Posted Date
Jan 29, 2026
Due Date
Feb 10, 2026
Release: Jan 29, 2026
Close: Feb 10, 2026
DESIGN BUILD: The anticipated scope may include, but is not limited to, the following: Phase I: Includes airfield apron construction; grading and drainage; installation of a jet blast deflector; development of water storage, pump stations, and a communication node; roadway construction; upgrades and relocations to existing utilities; construction of aircraft parking and maintenance facilities, including a maintenance hangar and squadron operations facility; development of a flight simulator facility and an avionics re-programming laboratory; and associated design input and management. Phase II: Includes construction of a fuel cell facility; a low-observable (LO) corrosion control facility and wash rack; a consolidated maintenance facility; a maintenance training facility; a fuel station; and a weapons storage facility, along with associated design input and management. Phase III: Includes expansion of the R-11 fuel stand; construction of a satellite dining facility; a DFAC storage facility; a 240-personnel dormitory; and associated design input and management.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →