Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Hickory (NC) issued a Request for Qualifications to perform a condition assessment of the existing 2MG and 1MG clearwells at its Water Treatment Facility, including development of design documents for structural rehabilitation and coatings. The selected firm must also evaluate the coagulation and filtration processes and provide a technical approach, project management, budget/schedule control, and staff qualifications with at least three similar project references. All solicitation documents and submission instructions are hosted on the buyer’s procurement portal (PublicPurchase) linked from the Bid Banana listing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The purpose of the Facility Condition Assessment is to establish a baseline on the current condition of Meydenbauer Center focusing on infrastructure elements and major equipment. The assessment report will provide the BCCA with a reasonable set of expectations regarding future repairs and replacement, and a design team with critical information in developing cost estimates for future repairs and renovations.
Posted Date
Jan 6, 2026
Due Date
Feb 6, 2026
Release: Jan 6, 2026
Close: Feb 6, 2026
The purpose of the Facility Condition Assessment is to establish a baseline on the current condition of Meydenbauer Center focusing on infrastructure elements and major equipment. The assessment report will provide the BCCA with a reasonable set of expectations regarding future repairs and replacement, and a design team with critical information in developing cost estimates for future repairs and renovations.
AvailableThis solicitation is an open RFR issued by the Division of Capital Asset Management and Maintenance (DCAMM) for statewide facility condition assessments. Respondents are instructed to review the RFR and submit electronic quotes for professional engineering services to perform the assessments.
Posted Date
-
Due Date
Feb 28, 2026
Release: -
Close: Feb 28, 2026
This solicitation is an open RFR issued by the Division of Capital Asset Management and Maintenance (DCAMM) for statewide facility condition assessments. Respondents are instructed to review the RFR and submit electronic quotes for professional engineering services to perform the assessments.
AvailableWork includes water treatment facility improvements (phase 2).
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes water treatment facility improvements (phase 2).
AvailableThe purpose of this project is to complete improvements to the existing water treatment facility at the Fire Center. Work for this project includes but is not limited to the following: a) Mobilization, project management, and quality control. b) Installing the new and relocated treatment process equipment including but not limited to filter housings, baffle tanks, chemical feed pumps, all associated process monitoring instrumentation and equipment, and associated process valves and piping and drums. c) Work shall include installation of all electrical wiring, HVAC, piping, and completion of all associated site work related to improvements. d) Demolition of the existing water treatment building after relocation of existing water treatment components.
Posted Date
Jan 23, 2026
Due Date
Feb 12, 2026
Release: Jan 23, 2026
Close: Feb 12, 2026
The purpose of this project is to complete improvements to the existing water treatment facility at the Fire Center. Work for this project includes but is not limited to the following: a) Mobilization, project management, and quality control. b) Installing the new and relocated treatment process equipment including but not limited to filter housings, baffle tanks, chemical feed pumps, all associated process monitoring instrumentation and equipment, and associated process valves and piping and drums. c) Work shall include installation of all electrical wiring, HVAC, piping, and completion of all associated site work related to improvements. d) Demolition of the existing water treatment building after relocation of existing water treatment components.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis