Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Austin Energy
Austin Energy’s District Energy and Cooling (DEC) requests replacement of condenser water pumps, including all labor, parts, equipment, and supervision required at the District cooling plant. The work covers furnishing materials, installation, and commissioning to restore or improve cooling plant operations.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Austin
Furnishing all labor, tools, parts/material, equipment, supervision, and incidentals for performing all work required for the following project at DEC's District cooling plant.
Posted Date
Oct 31, 2025
Due Date
Dec 11, 2025
Release: Oct 31, 2025
City of Austin
Close: Dec 11, 2025
Furnishing all labor, tools, parts/material, equipment, supervision, and incidentals for performing all work required for the following project at DEC's District cooling plant.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Clark County
Provide chilled water pump, chiller valve & condenser water strainer replacement
Posted Date
Oct 8, 2025
Due Date
Dec 18, 2025
Release: Oct 8, 2025
Clark County
Close: Dec 18, 2025
Provide chilled water pump, chiller valve & condenser water strainer replacement
AvailableSalinas Valley Memorial Healthcare District
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Salinas Valley Memorial Healthcare District
Close: Dec 9, 2025
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
AvailableClark County
Clark County's Invitation for Bid requests replacement of the Regional Justice Center central plant chilled water pumps, chiller valves, and condenser water strainer, including removal and replacement of multiple chiller isolation valves and pumps, associated hydronic piping, insulation, pressure gauges, and t-strainer baskets, plus related structural and electrical/mechanical work. A pre-bid conference and site walk are scheduled and the bid opening will be held via Webex; contact details and schedule dates are listed on the posting.
Posted Date
Oct 8, 2025
Due Date
Dec 9, 2025
Release: Oct 8, 2025
Clark County
Close: Dec 9, 2025
Clark County's Invitation for Bid requests replacement of the Regional Justice Center central plant chilled water pumps, chiller valves, and condenser water strainer, including removal and replacement of multiple chiller isolation valves and pumps, associated hydronic piping, insulation, pressure gauges, and t-strainer baskets, plus related structural and electrical/mechanical work. A pre-bid conference and site walk are scheduled and the bid opening will be held via Webex; contact details and schedule dates are listed on the posting.