Clark County
Clark County's Invitation for Bid requests replacement of the Regional Justice Center central plant chilled water pumps, chiller valves, and condenser water strainer, including removal and replacement of multiple chiller isolation valves and pumps, associated hydronic piping, insulation, pressure gauges, and t-strainer baskets, plus related structural and electrical/mechanical work. A pre-bid conference and site walk are scheduled and the bid opening will be held via Webex; contact details and schedule dates are listed on the posting.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Clark County
Clark County is soliciting bids to replace chilled water pumps, chiller isolation valves, and condenser water strainers at the Regional Justice Center central plant, including associated hydronic piping, insulation, and structural modifications. The solicitation includes a pre-bid/site walk and will be opened via Webex; questions and attachments are available on the buyer’s posting (some documents require login to view).
Posted Date
Oct 8, 2025
Due Date
Apr 30, 2026
Release: Oct 8, 2025
Clark County
Close: Apr 30, 2026
Clark County is soliciting bids to replace chilled water pumps, chiller isolation valves, and condenser water strainers at the Regional Justice Center central plant, including associated hydronic piping, insulation, and structural modifications. The solicitation includes a pre-bid/site walk and will be opened via Webex; questions and attachments are available on the buyer’s posting (some documents require login to view).
AvailableClark County
Provide chilled water pump, chiller valve & condenser water strainer replacement
Posted Date
Oct 8, 2025
Due Date
Dec 9, 2025
Release: Oct 8, 2025
Clark County
Close: Dec 9, 2025
Provide chilled water pump, chiller valve & condenser water strainer replacement
AvailableTown of Jupiter
Furnish all labor, materials, tools, equipment, and supervision necessary to complete the replacement of chilled water pump #3.
Posted Date
Nov 4, 2025
Due Date
Nov 25, 2025
Release: Nov 4, 2025
Town of Jupiter
Close: Nov 25, 2025
Furnish all labor, materials, tools, equipment, and supervision necessary to complete the replacement of chilled water pump #3.
AvailableUniversity Of North Carolina At Chapel Hill
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
Posted Date
Aug 18, 2025
Due Date
Jan 14, 2026
Release: Aug 18, 2025
University Of North Carolina At Chapel Hill
Close: Jan 14, 2026
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis