Summary
Work includes 1 LS clearing and grubbing c; 18 CY topsoil, off-site; 150 TN replacement of unsuitable backfill material, gr 32, (modified subbase pile); 30 LF sanitary sewer force main, trenched, 1 1/4" HDPE (ips); 100 LF sanitary sewer force main, trenched, 3" hdpe (ips); 28 LF sanitary sewer service stub, trenched, 4" PVC sdr26; 2 EA sanitary sewer service stub, force main, e-one pump system; 40 LF curb and gutter, 30" (width), 6" (thickness); 15 TN HMA pavement by ton; 37 SY removal of sidewalk; 7 SY pcc, sidewalk, 4" (thickness); 1 LS core drill foundation wall / install link seals; 1269 GAL pump and clean existing lift station.