Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of New Bedford
Project consists of sewer separation. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Newark
Work includes 1 LS clearing and grubbing; 1 LS CCTV of sanitary and storm sewer; 1 LS temporary / bypass pumping; 1,443 CY filling, sealing, and abandonment of existing sewer; 10 EA abandonment of existing combined sewer manholes; 262 CY filling, sealing and abandonment of existing water pipe; 2,767 LF 8" PVC - sdr35; 533 VLF sanitary precast concrete manhole, additional depth; 50 CY sewer encasement; 2,884 LF sewer lateral reconnection; 388 EA sewer lateral cleanouts; 52 LF jack and bore location 2, 30" casing; 2,019 LF 12" HDPE - corrugated; 340 VF stormwater precast concrete manhole, additional depth; 7 EA precast concrete catch basin, 6' x 6'; 122 LF jack and bore location 1, at railroad with 60" casing.
Posted Date
Nov 3, 2025
Due Date
Dec 12, 2025
Release: Nov 3, 2025
City of Newark
Close: Dec 12, 2025
Work includes 1 LS clearing and grubbing; 1 LS CCTV of sanitary and storm sewer; 1 LS temporary / bypass pumping; 1,443 CY filling, sealing, and abandonment of existing sewer; 10 EA abandonment of existing combined sewer manholes; 262 CY filling, sealing and abandonment of existing water pipe; 2,767 LF 8" PVC - sdr35; 533 VLF sanitary precast concrete manhole, additional depth; 50 CY sewer encasement; 2,884 LF sewer lateral reconnection; 388 EA sewer lateral cleanouts; 52 LF jack and bore location 2, 30" casing; 2,019 LF 12" HDPE - corrugated; 340 VF stormwater precast concrete manhole, additional depth; 7 EA precast concrete catch basin, 6' x 6'; 122 LF jack and bore location 1, at railroad with 60" casing.
AvailableBase Portsmouth (00027)
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
Posted Date
Nov 7, 2025
Due Date
Nov 28, 2025
Release: Nov 7, 2025
Base Portsmouth (00027)
Close: Nov 28, 2025
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
AvailableLas Gallinas Valley Sanitary Dist
The phase 3: superstructure (multipurpose laboratory building) project is the final phase of a three-phase project consisting of a two-story building elevated on a raised level 1 structural deck.
Posted Date
Sep 26, 2025
Due Date
Nov 20, 2025
Release: Sep 26, 2025
Las Gallinas Valley Sanitary Dist
Close: Nov 20, 2025
The phase 3: superstructure (multipurpose laboratory building) project is the final phase of a three-phase project consisting of a two-story building elevated on a raised level 1 structural deck.
AvailableCity of Springfield
Work consists of 5,800 SY Gravel Access Road; 80 CY Rock Excavation; 5,426 sf Mainline Video Inspection; 400 CY Trench Foundation; 36 SF 18" CMP Culvert Pipe; 445 SF 18" ASTM F679 PS 115 PVC Pipe (in 36" Casing); 5 EA Concrete Manholes, 48".
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
City of Springfield
Close: Dec 2, 2025
Work consists of 5,800 SY Gravel Access Road; 80 CY Rock Excavation; 5,426 sf Mainline Video Inspection; 400 CY Trench Foundation; 36 SF 18" CMP Culvert Pipe; 445 SF 18" ASTM F679 PS 115 PVC Pipe (in 36" Casing); 5 EA Concrete Manholes, 48".
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis