Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the following work: installation of new dewatering box and related appurtenances, rehabilitation of existing biological treatment basins, removal of existing blower, installation of new 50 hp blower, installation of headworks cover, replacement of clarifier trough cleaning brushes, and miscellaneous electrical improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals from qualified firms experienced in construction management (CM) and inspection services. Construction of a new influent pump station structure with four constant speed and two variable speed submersible pumps with influent flow meters; a screening structure with two multi-rake screens and center emergency bypass channel; a shaftless screw conveyor and washer compactor to manage screenings; a new vortex grit chamber and associated grit pumping equipment; odor control equipment; and a new headworks electrical building to house the new equipment to power and control the new facility.
Posted Date
Nov 26, 2025
Due Date
Jan 19, 2026
Release: Nov 26, 2025
Close: Jan 19, 2026
Seeking proposals from qualified firms experienced in construction management (CM) and inspection services. Construction of a new influent pump station structure with four constant speed and two variable speed submersible pumps with influent flow meters; a screening structure with two multi-rake screens and center emergency bypass channel; a shaftless screw conveyor and washer compactor to manage screenings; a new vortex grit chamber and associated grit pumping equipment; odor control equipment; and a new headworks electrical building to house the new equipment to power and control the new facility.
AvailableThe work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
The work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
AvailableWetumpka Water Works & Sewer Board is soliciting sealed bids for the CWSRF 12-inch Force Main Rehabilitation at Hwy. 14 (Coosa River Bridge) in Wetumpka, Alabama. The work includes pipe hanger replacement/adjustment for a 12-inch ductile iron force main suspended beneath the bridge deck, per the bid advertisement. Bidding documents are available from Goodwyn Mills Cawood (GMC), and the project is funded by SRF with applicable federal requirements including BABA and American Iron and Steel.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
Wetumpka Water Works & Sewer Board is soliciting sealed bids for the CWSRF 12-inch Force Main Rehabilitation at Hwy. 14 (Coosa River Bridge) in Wetumpka, Alabama. The work includes pipe hanger replacement/adjustment for a 12-inch ductile iron force main suspended beneath the bridge deck, per the bid advertisement. Bidding documents are available from Goodwyn Mills Cawood (GMC), and the project is funded by SRF with applicable federal requirements including BABA and American Iron and Steel.
AvailableWest Cocalico Township Authority is soliciting bids via PennBid for the construction of a new approximately 2,500 SF garage pole building that includes an office and associated site work. The project is divided into three contracts: General Construction, Electrical Construction, and Mechanical Construction. Bids are due by 10:00 AM EST on February 2, 2026, and the project is subject to Pennsylvania Prevailing Wage and other statutory requirements.
Posted Date
Dec 29, 2025
Due Date
Feb 2, 2026
Release: Dec 29, 2025
Close: Feb 2, 2026
West Cocalico Township Authority is soliciting bids via PennBid for the construction of a new approximately 2,500 SF garage pole building that includes an office and associated site work. The project is divided into three contracts: General Construction, Electrical Construction, and Mechanical Construction. Bids are due by 10:00 AM EST on February 2, 2026, and the project is subject to Pennsylvania Prevailing Wage and other statutory requirements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →