Summary
Project Scope:The contractor will provide labor, tools, and materials (including all Argus Controls system software and materials as detailed in the attached Argus proposal),necessary to complete the following scope of work: Demolition / Removal: Remove and dispose of (3) existing low voltage control panels and (3) contactor panels. Disconnect and label existing wiring as required for re-termination into new equipment. New Panel Installation: Furnish and install (1) new 60” x 36” Relay Contactor control panel, including: Panel mounting and anchoring ; Re-routing conduit to Argus panel; Termination of field wiring. See attached file.