Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contract shall consist of the construction of a 150,000 gallon elevated water storage tanks with all appurtenances as shown in the plans and specifications for a fully operational facility. 300 LF provide equipment, materials and labor to construct fencing with double gate measuring 20' as shown on plans and described on the dtail sheet; 1 LS provide equipment, materials and labor to construct altitude valve and vault, bypass, all valves, fittings, anchors and hydrant as shown on detail sheet 5; 300 LF provide equipment, materials and labor to install 12" dr-21 pvc waterline; 1 ea provide equipment, materials and labor to install 12" gate valve with box; 1 ea provide equipment, materials and labor to install 12" x 12" tee; 1 ea provide equipment, materials and labor to install 12" stub out with cap. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of construction of a fire protection water system water storage tank improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work consists of construction of a fire protection water system water storage tank improvements.
AvailableRelease: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailableConstruct approx., 8,152' of 4" - 10" diameter watermain, the abandonment of (2) wells, the demolition of the elevated water storage tank and ground level storage tank.
Posted Date
Dec 4, 2025
Due Date
Jan 21, 2026
Release: Dec 4, 2025
Close: Jan 21, 2026
Construct approx., 8,152' of 4" - 10" diameter watermain, the abandonment of (2) wells, the demolition of the elevated water storage tank and ground level storage tank.
AvailableConstruction of the following Project: Industrial Park #1 Water Improvements. The Project includes the following approx quantities of work: 1. 5,500 LF of 12" water main. 2. 1,000 LF of 10” through 6" water main. 3. 54 Service Assemblies.
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
Close: Dec 15, 2025
Construction of the following Project: Industrial Park #1 Water Improvements. The Project includes the following approx quantities of work: 1. 5,500 LF of 12" water main. 2. 1,000 LF of 10” through 6" water main. 3. 54 Service Assemblies.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis