Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of North Andover
Perform scheduled cleaning of five (5) sewer pump station wet wells.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Cameron
The City of Cameron is soliciting bids for the Little River Pump Station (rebid), including construction of a pump station with a 20-foot inside diameter circular wet well, intake piping with screens, a low‑head impoundment structure, and a 16‑inch raw water line. Work also includes a diesel‑fueled generator, an electrical building, and associated electrical and control improvements.
Posted Date
-
Due Date
Dec 4, 2025
City of Cameron
Close: Dec 4, 2025
The City of Cameron is soliciting bids for the Little River Pump Station (rebid), including construction of a pump station with a 20-foot inside diameter circular wet well, intake piping with screens, a low‑head impoundment structure, and a 16‑inch raw water line. Work also includes a diesel‑fueled generator, an electrical building, and associated electrical and control improvements.
AvailableTexas Department of Transportation
Provide pump station & drainage system cleaning.
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Texas Department of Transportation
Close: Dec 9, 2025
Provide pump station & drainage system cleaning.
AvailableSewerage Commission Oroville Region
Project consist of Pump Station.
Posted Date
Oct 21, 2025
Due Date
Dec 3, 2025
Release: Oct 21, 2025
Sewerage Commission Oroville Region
Close: Dec 3, 2025
Project consist of Pump Station.
AvailableCity of Booneville
The project includes the replacement of an existing sewer lift station with a new sewer lift station which will consist of an 8' diameter concrete wet well, 10'x8' valve vault, duplex submersible pumps, steel frame and electric hoist for pump removal, gravity sewer manholes and lines, sewer force mains, security fencing, and a gravel parking pad.
Posted Date
Oct 27, 2025
Due Date
Nov 19, 2025
Release: Oct 27, 2025
City of Booneville
Close: Nov 19, 2025
The project includes the replacement of an existing sewer lift station with a new sewer lift station which will consist of an 8' diameter concrete wet well, 10'x8' valve vault, duplex submersible pumps, steel frame and electric hoist for pump removal, gravity sewer manholes and lines, sewer force mains, security fencing, and a gravel parking pad.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis