Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Murfreesboro
The City of Murfreesboro is soliciting sealed bids for cleaning and inspection services for multiple Stones River WTP facilities, including membrane feed wells, clearwells, river intake, and auxiliary intake. The work requires licensed commercial diving contractors to remove interior sediment, perform detailed inspections with video and photographic reporting, and comply with applicable OSHA/EPA/TDEC/AWWA/NFPA standards.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Murfreesboro
Cleaning and Inspection of the Stones River WTP Membrane Feed Wells.
Posted Date
Nov 18, 2025
Due Date
Dec 11, 2025
Release: Nov 18, 2025
City of Murfreesboro
Close: Dec 11, 2025
Cleaning and Inspection of the Stones River WTP Membrane Feed Wells.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Forsyth County
Water intake contract B tunnels, shafts, and intake structure. Rock Tunnel and Shaft Construction - Includes construction of the pump station tunnel, pump station shaft, and intermediate shaft. Rock tunneling methods, including drilling and blasting, are required to construct the tunnel and shafts. Permanent linings will be installed in the pump station shaft and pump station tunnel. Microtunnel Construction - Microtunneling is planned to construct the intake tunnel. Intake Structure Construction - The intake structure will be constructed in Lake Sidney Lanier. The work will involve various underwater construction processes.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
Forsyth County
Close: Dec 18, 2025
Water intake contract B tunnels, shafts, and intake structure. Rock Tunnel and Shaft Construction - Includes construction of the pump station tunnel, pump station shaft, and intermediate shaft. Rock tunneling methods, including drilling and blasting, are required to construct the tunnel and shafts. Permanent linings will be installed in the pump station shaft and pump station tunnel. Microtunnel Construction - Microtunneling is planned to construct the intake tunnel. Intake Structure Construction - The intake structure will be constructed in Lake Sidney Lanier. The work will involve various underwater construction processes.
AvailableUpper Colorado Regional Office
Construct new pumping plant: sitework, including cement-bentonite cutoff wall. Steel manifold piping, including connection to existing ductile iron line pipe. Metal building system and foundations. Cast-in-place concrete building structures. Vertical turbine pumping units. Air chambers. Electrical system. SCADA system. Water quality monitoring equipment. Demolition of existing pumping plant.
Posted Date
Jun 10, 2025
Due Date
Jan 16, 2026
Release: Jun 10, 2025
Upper Colorado Regional Office
Close: Jan 16, 2026
Construct new pumping plant: sitework, including cement-bentonite cutoff wall. Steel manifold piping, including connection to existing ductile iron line pipe. Metal building system and foundations. Cast-in-place concrete building structures. Vertical turbine pumping units. Air chambers. Electrical system. SCADA system. Water quality monitoring equipment. Demolition of existing pumping plant.
AvailableDLA Maritime
347 ea, filter element, intake, NSN: 2940013612407.
Posted Date
Nov 27, 2025
Due Date
Dec 12, 2025
Release: Nov 27, 2025
DLA Maritime
Close: Dec 12, 2025
347 ea, filter element, intake, NSN: 2940013612407.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →