Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Class D HMA patching of various thickness on the Municipal Campus.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
All bids must be sealed and clearly marked on the outside packaging.
Posted Date
Jan 19, 2026
Due Date
Feb 12, 2026
Release: Jan 19, 2026
Close: Feb 12, 2026
All bids must be sealed and clearly marked on the outside packaging.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 500' storm sewers to be cleaned 12"; 11,606' shoulder rumble strips, 8"; 2,228 SY class D patches, type II, 10"; 1,599 SY class d patches, type III, 10; 5 EA. Frames and grates, type 24; 7,637 ton polymerized hot-mix asphalt surface course, IL-9.5, mix "E", n70; 4,286 ton polymerized hot-mix asphalt binder course, IL-4. 75, N50; 178 ton mixture for cracks, joints, and flangeways; 24,560' longitudinal joint sealant.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Work includes 500' storm sewers to be cleaned 12"; 11,606' shoulder rumble strips, 8"; 2,228 SY class D patches, type II, 10"; 1,599 SY class d patches, type III, 10; 5 EA. Frames and grates, type 24; 7,637 ton polymerized hot-mix asphalt surface course, IL-9.5, mix "E", n70; 4,286 ton polymerized hot-mix asphalt binder course, IL-4. 75, N50; 178 ton mixture for cracks, joints, and flangeways; 24,560' longitudinal joint sealant.
AvailableWork consists of: pavement removal, 500 SY; remove sidewalk concrete, 60 SY; common excavation, 35 CY; compacted aggregate, no. 53, 100 TN; compacted aggregate, no. 73, 70 TN; HMA patching, full depth, Type C, 300 TN; HMA patching, partial depth, Type C, 300 TN; HMA patching, partial depth, Type D, 250 TN; asphalt milling, 1 1/2-IN, 5000 SY; milling, asphalt, 2-IN, 5000 SY; HMA wedge and level, Type C, 250 TN; HMA wedge and level, Type D, 250 TN; asphalt for tack coat, 6 TN; PCCP patching, full depth, 425 SY; sidewalk, concrete 5SY; curb ramp, concrete, 50 SY; temporary pavement marking, removable, 4-IN, 2500 LF; line, paint, broken, yellow, 6-IN, 2600 LF; 4-IN, 2500 LF; line, paint, broken, white, 6-IN, 5280LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: pavement removal, 500 SY; remove sidewalk concrete, 60 SY; common excavation, 35 CY; compacted aggregate, no. 53, 100 TN; compacted aggregate, no. 73, 70 TN; HMA patching, full depth, Type C, 300 TN; HMA patching, partial depth, Type C, 300 TN; HMA patching, partial depth, Type D, 250 TN; asphalt milling, 1 1/2-IN, 5000 SY; milling, asphalt, 2-IN, 5000 SY; HMA wedge and level, Type C, 250 TN; HMA wedge and level, Type D, 250 TN; asphalt for tack coat, 6 TN; PCCP patching, full depth, 425 SY; sidewalk, concrete 5SY; curb ramp, concrete, 50 SY; temporary pavement marking, removable, 4-IN, 2500 LF; line, paint, broken, yellow, 6-IN, 2600 LF; 4-IN, 2500 LF; line, paint, broken, white, 6-IN, 5280LF.
AvailableWork consists of: excavation, common, 3204 CY; linear grading, 9724 LF; HMA patching, full depth, Type C, 162TN; HMA patching, partial depth, Type C, 27TN; HMA patching, partial depth, Type D, 2314 TN; milling, asphalt, 1 1/2-IN, 24794 SY; milling, asphalt, 2-IN, 350454 SY; milled HMA corrugations, conventional, 159454 LF; construction sign, Type A 123 EA; line, multi-component, solid, white, 6-IN, 89834 LF; line, multi-component, solid, yellow, 6-IN, 89834 LF; temporary pavement marking, removable, 6-IN, 21280 SF; barricade, Type III-A 72. LF; PCCP patching, full depth, 235 SY; transverse marking, thermoplastic, crosshatch line, white, 24-IN, 1026 LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: excavation, common, 3204 CY; linear grading, 9724 LF; HMA patching, full depth, Type C, 162TN; HMA patching, partial depth, Type C, 27TN; HMA patching, partial depth, Type D, 2314 TN; milling, asphalt, 1 1/2-IN, 24794 SY; milling, asphalt, 2-IN, 350454 SY; milled HMA corrugations, conventional, 159454 LF; construction sign, Type A 123 EA; line, multi-component, solid, white, 6-IN, 89834 LF; line, multi-component, solid, yellow, 6-IN, 89834 LF; temporary pavement marking, removable, 6-IN, 21280 SF; barricade, Type III-A 72. LF; PCCP patching, full depth, 235 SY; transverse marking, thermoplastic, crosshatch line, white, 24-IN, 1026 LF.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →