Summary
Work inlcudes 3 EA utility location by hydroexcavating (all depths); 20,000 LF 8" pipe bursting (pneumatic/static) w/hdpe dips dr 13.5 (12' depth); 6,000 8" pipe bursting (pneumatic/static) w/hdpe dips dr 13.5 (12' depth); 1,300 LF 10"-15" pipe bursting (pneumatic/static) w/hdpe dips dr 13.5 (12' depth); 1,500 LF 10"-15" pipe bursting (pneumatic/static) w/hdpe dips dr 13. 5 (12' depth); 250 LF 18"-24" pipe bursting (pneumatic/static) w/hdpe dips dr 13.5 (12' depth); 100 LF 18"-24" pipe bursting (pneumatic/static) w/hdpe dips dr 13.5 (12' depth); 1,000 LF 12" open trench installation w/sdr 26 pvc (12' depth). See attached file.