Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work components include the removal and replacement of concrete sidewalk, driveway approach, curb & gutter, and curb ramps at various locations citywide. Work includes repainting address marking and replacing existing monuments if disturbed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work shall consist 14,648 SF of remove and replace std sidewalk, 344 SF of remove and replace std sidewalk 6", 82 LF of remove an replace curb & gutter 6", 417 LF of remove an replace curb & gutter, 96 LF of pcc curb only (varying height), 100 LF of street light and conduit and wiring repair.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
The work shall consist 14,648 SF of remove and replace std sidewalk, 344 SF of remove and replace std sidewalk 6", 82 LF of remove an replace curb & gutter 6", 417 LF of remove an replace curb & gutter, 96 LF of pcc curb only (varying height), 100 LF of street light and conduit and wiring repair.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Miamisburg is soliciting bids via BidExpress for the 2026 Sidewalk, Curb & Gutter Program to remove and replace deteriorated sidewalk, curb and gutter, and drive aprons at various locations. Bids are due by 1:00 PM (local time) on February 17, 2026, and plans/specifications are available exclusively on the BidExpress platform. The project is subject to Ohio prevailing wage requirements and must be completed by September 25, 2026.
Posted Date
-
Due Date
Feb 17, 2026
Release: -
Close: Feb 17, 2026
The City of Miamisburg is soliciting bids via BidExpress for the 2026 Sidewalk, Curb & Gutter Program to remove and replace deteriorated sidewalk, curb and gutter, and drive aprons at various locations. Bids are due by 1:00 PM (local time) on February 17, 2026, and plans/specifications are available exclusively on the BidExpress platform. The project is subject to Ohio prevailing wage requirements and must be completed by September 25, 2026.
AvailableFurnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 35,600 LF curb & gutter replacement; 86,770 SF sidewalk, curb ramp and driveway approach replacement; 916 SF new sidewalk construction, 555 SY full depth concrete street pavement patching and grass terrace restoration.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Furnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 35,600 LF curb & gutter replacement; 86,770 SF sidewalk, curb ramp and driveway approach replacement; 916 SF new sidewalk construction, 555 SY full depth concrete street pavement patching and grass terrace restoration.
AvailableWork include tree removal, traffic control, adjustment of survey monument and utility boxes, frames, and covers, protection of underground utility services (e.g., gas, water, sewer, electrical, telecom), concrete sidewalk, concrete driveways, concrete valley gutter, concrete curb, curb, and gutter, curb ramps, storm drain infrastructure improvements, asphalt concrete paving, and curb painting.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Work include tree removal, traffic control, adjustment of survey monument and utility boxes, frames, and covers, protection of underground utility services (e.g., gas, water, sewer, electrical, telecom), concrete sidewalk, concrete driveways, concrete valley gutter, concrete curb, curb, and gutter, curb ramps, storm drain infrastructure improvements, asphalt concrete paving, and curb painting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →