Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work shall include, but not be limited to, demolition of existing headwalls, the construction of new aluminum sheet piling headwall and/or riprap installation, improvements to existing drainage system, asphaltic concrete pavement restoration, striping, concrete sidewalk and curb replacement, guardrail restoration, earthwork and landscape restoration improvements. The work to be performed consists of furnishing all labor, materials, tools, and equipment necessary to complete this project, as indicated in the Special Conditions, Special Provisions, and Technical Specifications herein and within the project design plans.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of citywide traffic signal backplate improvement.
Posted Date
Nov 22, 2025
Due Date
Dec 18, 2025
Release: Nov 22, 2025
Close: Dec 18, 2025
Work consists of citywide traffic signal backplate improvement.
AvailablePhase III Lighting LED Upgrades Project at Nine Schools.
Posted Date
Aug 20, 2025
Due Date
Dec 19, 2025
Release: Aug 20, 2025
Close: Dec 19, 2025
Phase III Lighting LED Upgrades Project at Nine Schools.
Available2023 Capital Improvement Project - Phase 3. Separate Bids will be received for: General Construction, Electrical Work, and Mechanical Work.
Posted Date
Dec 9, 2025
Due Date
Dec 30, 2025
Release: Dec 9, 2025
Close: Dec 30, 2025
2023 Capital Improvement Project - Phase 3. Separate Bids will be received for: General Construction, Electrical Work, and Mechanical Work.
Availableproject includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
Posted Date
Sep 9, 2025
Due Date
Dec 29, 2025
Release: Sep 9, 2025
Close: Dec 29, 2025
project includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis