Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sidewalk & ada improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Repair and improve the existing sidewalks while enhancing the aesthetics and a sense of place. Improvements would create a safer, comfortable, convenient, and ADA-accessible transportation system, welcoming more pedestrians and bicyclists. Sidewalk Improvements would meet all Americans with Disabilities Act (ADA) requirements.
Posted Date
Jan 8, 2026
Due Date
Feb 12, 2026
Release: Jan 8, 2026
Close: Feb 12, 2026
Repair and improve the existing sidewalks while enhancing the aesthetics and a sense of place. Improvements would create a safer, comfortable, convenient, and ADA-accessible transportation system, welcoming more pedestrians and bicyclists. Sidewalk Improvements would meet all Americans with Disabilities Act (ADA) requirements.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of professional engineering design services for sidewalk and ADA improvements in various locations within the City of Weston, Florida.
Posted Date
Jan 29, 2026
Due Date
Mar 2, 2026
Release: Jan 29, 2026
Close: Mar 2, 2026
Procurement of professional engineering design services for sidewalk and ADA improvements in various locations within the City of Weston, Florida.
AvailableWork includes 75 CY unclassified excavation; 30 CY structural concrete, class a; 30 lbs reinforcing bars grad 60 #3; 1656 LF removal of existing curb & gutter; 50 LF removal of existing retaining wall; 454 SY removal of surfacing (sidewalk & concrete drive & asphalt; 605 SY concrete sidewalk 4" (ada ramps & det. Warning surface included); 765 SY concrete drive pad 6" (rebar included); 490 LF header curb; 1140 LF concrete vertical curb and gutter type b 6" x 24"; 60 LF concrete vertical curb and gutter type b 6" x 30"; 40 LF steel post and base post for aluminium panel signs. See attached file.
Posted Date
Jan 19, 2026
Due Date
Feb 23, 2026
Release: Jan 19, 2026
Close: Feb 23, 2026
Work includes 75 CY unclassified excavation; 30 CY structural concrete, class a; 30 lbs reinforcing bars grad 60 #3; 1656 LF removal of existing curb & gutter; 50 LF removal of existing retaining wall; 454 SY removal of surfacing (sidewalk & concrete drive & asphalt; 605 SY concrete sidewalk 4" (ada ramps & det. Warning surface included); 765 SY concrete drive pad 6" (rebar included); 490 LF header curb; 1140 LF concrete vertical curb and gutter type b 6" x 24"; 60 LF concrete vertical curb and gutter type b 6" x 30"; 40 LF steel post and base post for aluminium panel signs. See attached file.
AvailableInstallation and replacement of sidewalk within the Borough . The proposed improvements will include 45 ADA Ramps, 1000-SF of New Concrete Sidewalk, 750-SF of Concrete Sidewalk Replacement, 600-LF of new Concrete Curb.
Posted Date
Jan 21, 2026
Due Date
Feb 5, 2026
Release: Jan 21, 2026
Close: Feb 5, 2026
Installation and replacement of sidewalk within the Borough . The proposed improvements will include 45 ADA Ramps, 1000-SF of New Concrete Sidewalk, 750-SF of Concrete Sidewalk Replacement, 600-LF of new Concrete Curb.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →