Summary
The project generally includes site clearing, grubbing, construction of dual 20 million gallon HDPE lined storage lagoons, approx., 9,000 LF of miscellaneous piping ranging from 6" to 12" in diameter, piped waterway crossings including one bore, a submersible recycled water pump station, a vertical turbine pump back pump station, a vertical turbine irrigation pump station, associated electrical equipment, groundwater monitoring wells, site fencing, gravel access roads, flow measurement structures, surface grading and irrigation supply/collection ditches, other irrigation conveyance piping and features, and other miscellaneous site work associated with an 80-acre land application site.