Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of a new pre-treatment unit at the Sinking Creek WWTP designed to address and treat emerging contaminants. Also, a new sludge disposal system will be installed at the Pitman Creek WWTP site to receive dewatered sludge and process it such that it will no longer require offsite disposal. Various components of the project will include VFDs and/or high efficiency motors. SCADA will be used to optimize treatment procedures.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Waxahachie seeks proposals to dispose of sewage sludge (biosolids) generated by its Howard Road Wastewater Treatment Plant. The selected contractor will assume ownership and provide compliant transportation and disposal in accordance with TCEQ and EPA regulations, including required documentation and manifests. The base term is one year with options for annual renewals, and service must be performed within an operational radius of the plant.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
The City of Waxahachie seeks proposals to dispose of sewage sludge (biosolids) generated by its Howard Road Wastewater Treatment Plant. The selected contractor will assume ownership and provide compliant transportation and disposal in accordance with TCEQ and EPA regulations, including required documentation and manifests. The base term is one year with options for annual renewals, and service must be performed within an operational radius of the plant.
AvailableContract No. 2A General Construction - Construction of new grit removal system, sequencing batch reactors and blowers, equalization pumping system, tertiary filtration, on-site pump station, post-frame roofs, sludge handling system, associated pumping, piping, valves and start-up. Contract No. 2B Electrical Construction Remove power from old equipment to be demolished, connect all new equipment including grit removal system, sequencing batch reactors and blowers, tertiary filtration, sludge handling system, and furnish and install all control wiring and controls integration.
Posted Date
Dec 19, 2025
Due Date
Feb 4, 2026
Release: Dec 19, 2025
Close: Feb 4, 2026
Contract No. 2A General Construction - Construction of new grit removal system, sequencing batch reactors and blowers, equalization pumping system, tertiary filtration, on-site pump station, post-frame roofs, sludge handling system, associated pumping, piping, valves and start-up. Contract No. 2B Electrical Construction Remove power from old equipment to be demolished, connect all new equipment including grit removal system, sequencing batch reactors and blowers, tertiary filtration, sludge handling system, and furnish and install all control wiring and controls integration.
Sludge removal contractors for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
Sludge removal contractors for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons.
AvailableRelease: Dec 23, 2025
Close: Jan 22, 2026
Chemicals for wastewater treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →