Retrieving RFP details
Release
Close
City of Rolling Hills
Work includes modifications to the existing structure, site improvements, mechanical, and electrical improvements to support the installation of a new dual fuel backup generator .
City of Neosho
Provide and install one (1) new 150 kw standby generator for city hall and one (1) for city auditorium. No new gas service; generator must be compatible with existing fuel infrastructure natural gas.
University Of California San Diego
Removal of the existing emergency power diesel generator and it's detached fuel tank at Jacobs hall. Both pieces of equipment are located in the west basement mechanical room. The old generator will be replaced with a more efficient unit with a double walled attached fuel tank to meet secondary containment requirements.
City of Marion
Furnish and install a 150 KW / 521 Amp / 208 Volt Natural Gas Generator, Automated Transfer Switch, PCC sidewalk removal and replacement, 22 LF of PCC Curb and Gutter, and miscellaneous related work and appurtenance.
Release
Oct 16, 2025
Close
Nov 04, 2025