Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the replacement of approx. 2,220 LF of 8" sanitary sewer mains including the replacement of associated manholes and services within the rights-of-way
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include replacement of existing 8" sanitary sewer pipe and manholes on broadway with new 12" sanitary sewer pipe and manholes, including all associated earthwork, fittings, restoration and appurtenances.
Posted Date
Dec 22, 2025
Due Date
Jan 22, 2026
Release: Dec 22, 2025
Close: Jan 22, 2026
Work include replacement of existing 8" sanitary sewer pipe and manholes on broadway with new 12" sanitary sewer pipe and manholes, including all associated earthwork, fittings, restoration and appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of sewage treatment plant improvements and sanitary sewer replacement.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Construction of sewage treatment plant improvements and sanitary sewer replacement.
AvailableProject consists of a system wide rehabilitation of the sanitary sewer collection system consisting of Point Repairs, CIPP/Fold & Form Liner, Isolated Service Tap Repair, and Manhole Rehabilitation.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Project consists of a system wide rehabilitation of the sanitary sewer collection system consisting of Point Repairs, CIPP/Fold & Form Liner, Isolated Service Tap Repair, and Manhole Rehabilitation.
AvailableWork includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.