Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of construction of wastewater collection rehab. The scope of work consists of televising and cleaning the existing wastewater system, identifying areas of infiltration, and repairing the identified issues. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes the rehab of the existing influent wastewater pump station. The work also includes rehab of the junction box that collects flow from PS and flows into the treatment plant headworks. A bypass pumping connection on the 36" force main will be installed to facilitate the junction box rehab work. The project will also include the replacement of valves at the overflow basin on the west side of the site.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
The project includes the rehab of the existing influent wastewater pump station. The work also includes rehab of the junction box that collects flow from PS and flows into the treatment plant headworks. A bypass pumping connection on the 36" force main will be installed to facilitate the junction box rehab work. The project will also include the replacement of valves at the overflow basin on the west side of the site.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a firm (CONSULTANT) to develop a Wastewater Master Plan (Master Plan) to ensure continual and perpetual outstanding service to our customers. The ideal consultant will have a firm understanding of the wastewater utility industry and visionaries to help develop the City’s future. Seeking qualified Firms to furnish all labor, equipment, supplies, and material as necessary for Wastewater Master Plan for Collection System.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
Seeking a firm (CONSULTANT) to develop a Wastewater Master Plan (Master Plan) to ensure continual and perpetual outstanding service to our customers. The ideal consultant will have a firm understanding of the wastewater utility industry and visionaries to help develop the City’s future. Seeking qualified Firms to furnish all labor, equipment, supplies, and material as necessary for Wastewater Master Plan for Collection System.
AvailableConsists of removing an existing 4” waterline, encasement, and hanger system from the Highway 110 Little Red River Bridge, installing a new 6” waterline across the Little Red River by boring the river, tying in the new waterline to existing facilities, and replacement of the system's raw water intake screen and suction pipe.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Consists of removing an existing 4” waterline, encasement, and hanger system from the Highway 110 Little Red River Bridge, installing a new 6” waterline across the Little Red River by boring the river, tying in the new waterline to existing facilities, and replacement of the system's raw water intake screen and suction pipe.
AvailableWork include lining of approx 1,240 LF of 12" wastewater main, lining of 5 manholes, the full replacement of 1 manhole, and all related appurtenances and restoration.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Work include lining of approx 1,240 LF of 12" wastewater main, lining of 5 manholes, the full replacement of 1 manhole, and all related appurtenances and restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →