Summary
The project consists of street reconstruction/streetscaping, including curb & gutter, storm sewer system, sidewalk, lighting, hma street resurfacing, pcc pavement and streetscape amenities. Work also includes 544 SY of aggregate base course, type b 4"; 1,112 SY of portland cement concrete base course (variable depth); 250 TON of aggregate for temporary access; 40,260 SF of portland cement concrete driveway pavement, 7"; 5,442 SY of hot-mix asphalt surface removal, variable depth; 1,720 SY of seeding (special); 2,425 SY of pavement removal; 485 SY of driveway pavement removal; 38,897 SF of sidewalk removal; 4,219 ft of thermoplastic pavement marking - line 4". See outside link.