Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of approx. 19,713 LF of Sanitary and Storm Sewer Cleaning at eight (8) separate locations. This includes approximately 334 L.F. of 42-inch storm sewer pipe, 13,800 L.F. of 8-inch, 1,288 L.F. of 10-inch, and 4,291 L.F. of 12-inch sanitary sewer main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 86,000 LF of 12" sanitary sewers; 21,500 LF of 06"-12" heavy cleaning sanitary sewers; 19,300 LF of 15"-21" final tv investigation and log sanitary sewers; 10 EA cutting service lead protrusions.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Work includes approx 86,000 LF of 12" sanitary sewers; 21,500 LF of 06"-12" heavy cleaning sanitary sewers; 19,300 LF of 15"-21" final tv investigation and log sanitary sewers; 10 EA cutting service lead protrusions.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
AvailableThe City of Euless issued a solicitation for the FY 2026 Sanitary Sewer Replacement project to rehabilitate and replace approximately 2,591 linear feet of sanitary sewer using trenchless technology and new HDPE piping. The project includes the removal and installation of manholes, cleanouts, and CCTV inspection with an estimated value range of $500,000 to $1,500,000. Bids are due by February 11, 2026, for a contract period of 120 calendar days following the notice to proceed.
Posted Date
Jan 23, 2026
Due Date
Feb 11, 2026
Release: Jan 23, 2026
Close: Feb 11, 2026
The City of Euless issued a solicitation for the FY 2026 Sanitary Sewer Replacement project to rehabilitate and replace approximately 2,591 linear feet of sanitary sewer using trenchless technology and new HDPE piping. The project includes the removal and installation of manholes, cleanouts, and CCTV inspection with an estimated value range of $500,000 to $1,500,000. Bids are due by February 11, 2026, for a contract period of 120 calendar days following the notice to proceed.
AvailableScope of work: Clean approx. 34,422 feet of pipe using high-velocity jet/vacuum machinery equipped with mechanical measuring device capable of determining distance of travel into the pipeline. Televise approx. 34,422 feet of pipe using a color camera specifically designed and constructed for sewer inspection. See attached file.
Posted Date
Jan 9, 2026
Due Date
Mar 5, 2026
Release: Jan 9, 2026
Close: Mar 5, 2026
Scope of work: Clean approx. 34,422 feet of pipe using high-velocity jet/vacuum machinery equipped with mechanical measuring device capable of determining distance of travel into the pipeline. Televise approx. 34,422 feet of pipe using a color camera specifically designed and constructed for sewer inspection. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →