Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
All 3 phase and single phase (1) poles will be replaced. All used corresponding hardware, wire and pole cuts will be returned for survey and disposal. All new pole construction will be vertical. All conductors will be 336 ACSR, and 4/0 ACSR neutral. Existing conductors smaller than 336 ACSR or 4/0 ACSR will be removed and replaced. Remove and re-install all new fiberglass standoff arms, to the new poles and all porcelain will be replaced with polymer insulators. All serviceable transformers will be transferred.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Procurement of services for Fayetteville Rd. re-conduction and pole replacement.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Procurement of services for Fayetteville Rd. re-conduction and pole replacement.
AvailableProvide on-call tree removal services to the City of Fairburn.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Provide on-call tree removal services to the City of Fairburn.
AvailableWork include removal and disposing of existing lamp post base and any debris, replacement/repair of any compromised conduit & electrical wiring, and the installation of a new "like kind" lamp pole base. Upon completion of new light pole base, respondent to set and wire existing lamp post, which is currently stored on site.
Posted Date
Nov 25, 2025
Due Date
Jan 13, 2026
Release: Nov 25, 2025
Close: Jan 13, 2026
Work include removal and disposing of existing lamp post base and any debris, replacement/repair of any compromised conduit & electrical wiring, and the installation of a new "like kind" lamp pole base. Upon completion of new light pole base, respondent to set and wire existing lamp post, which is currently stored on site.
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Posted Date
Nov 17, 2025
Due Date
Jan 6, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis
Release: Nov 17, 2025
Close: Jan 6, 2026
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Available