Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide street paving and drainage improvements. Major items of work include but are not necessarily limited to a base bid including approx. 4,892 SY of 6" reinforced concrete pavement with 6" flexible base subgrade, 817 SY and 6" of HMAC Pavement with 6" flexible base subgrade, 2,640 LF of 18" through 54" storm sewer, inlets, manholes and headwalls, with water and sanitary sewer adjustments and related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 18, 2025
Close: Jan 21, 2026
Provide street paving improvements.
AvailableCDBG chemung street paving and drainage.
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
CDBG chemung street paving and drainage.
The work includes demolition of street which is an existing one-way asphalt road; widening of the road to improve it for two-way traffic; installing new base and pavement section; and installing new storm drainage pipes and structures within the city right-of-way and easements as described in these contract documents. Specifically, street which is approx. 13' +/- wide (width varies) will be demolished to earth subgrade which includes asphalt pavement, base materials, and any additional subgrade earth materials as required to meet the proposed elevations for the new pavement section described in these documents and as illustrated on the drawings. Contractor shall grade and widen the proposed two-way road to 26' wide from back of curb to back of curb.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
The work includes demolition of street which is an existing one-way asphalt road; widening of the road to improve it for two-way traffic; installing new base and pavement section; and installing new storm drainage pipes and structures within the city right-of-way and easements as described in these contract documents. Specifically, street which is approx. 13' +/- wide (width varies) will be demolished to earth subgrade which includes asphalt pavement, base materials, and any additional subgrade earth materials as required to meet the proposed elevations for the new pavement section described in these documents and as illustrated on the drawings. Contractor shall grade and widen the proposed two-way road to 26' wide from back of curb to back of curb.
The City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
The City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis