Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Hot Mix Asphalt Overlay of 0.75" HMA Level Binder and 1.5" HMA Surface Course, ADA Sidewalk Remove and Replace, Curb and Gutter Remove and Replace, Pipe Culvert Remove and Replace, and Sanitary Manhole Reconstruction, at various streets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
8.78 mil gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
8.78 mil gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips. See outside link.
AvailablePremium
Access the largest public sector contact database
Replace culverts, cold plane AC pavement and overlay with HMA.
Posted Date
Oct 6, 2025
Due Date
Dec 18, 2025
Release: Oct 6, 2025
Close: Dec 18, 2025
Replace culverts, cold plane AC pavement and overlay with HMA.
Availablework includes approx. 6,776 TON of HMA, 2, 58S, surface, 9.5 mm (TON); 3,388 TON of HMA wedge and level, type B (TON); 52,800 LF of line, multi-component, solid, white, 4" (LF); 52,800 LF of line, multi-component, solid, yellow, 4" (LF); 1,955 TON of compacted aggregate, no.53 (TON); 781 SY of milling, transition (SY); 360 SY of milling, approach (SY); 407 TON of HMA patching, full depth, type B (TON); see outside links for more details.
Posted Date
Nov 21, 2025
Due Date
Dec 22, 2025
Release: Nov 21, 2025
Close: Dec 22, 2025
work includes approx. 6,776 TON of HMA, 2, 58S, surface, 9.5 mm (TON); 3,388 TON of HMA wedge and level, type B (TON); 52,800 LF of line, multi-component, solid, white, 4" (LF); 52,800 LF of line, multi-component, solid, yellow, 4" (LF); 1,955 TON of compacted aggregate, no.53 (TON); 781 SY of milling, transition (SY); 360 SY of milling, approach (SY); 407 TON of HMA patching, full depth, type B (TON); see outside links for more details.
AvailableStructure repairs, mill and hma overlay, and guardrail, 0.360 miles Work includes, 198 SF deck spall repair, 8,063 unit traffic control signs, 4,525 SF, obliteration of pavement marking. 1,390 LF, state furnished median barrier, 12,548 LF, short term 6in line-type r. 14,728 LF, pvmt mk painted 6in line. 716 lf, w-beam guardrail. 361 LF crack sealing.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
Structure repairs, mill and hma overlay, and guardrail, 0.360 miles Work includes, 198 SF deck spall repair, 8,063 unit traffic control signs, 4,525 SF, obliteration of pavement marking. 1,390 LF, state furnished median barrier, 12,548 LF, short term 6in line-type r. 14,728 LF, pvmt mk painted 6in line. 716 lf, w-beam guardrail. 361 LF crack sealing.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis