Summary
Qualified trenchless rehabilitation contractors to furnish and install a structural liner within an existing 24" corrugated metal culvert located between 105 and 107 Christie Lane. The culvert runs approx. 70–75 LF north–south within Town right‑of‑way and has unrestricted surface access for project operations. Inspections document a downward bend at mid‑pipe, severe invert loss, rusted‑out sections, and edge deterioration, creating structural and hydraulic deficiencies. The Town intends to rehabilitate the culvert using a cured‑in‑place pipe (CIPP) or equivalent trenchless structural liner that restores the full hydraulic capacity and long‑term durability of the crossing.