Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of masonry; misc and ornamental metals; waterproofing/damp-proofing/caulking; roofing & flashing; tile; acoustical tile, resilient flooring; painting; elevator; fire protection; plumbing; hvac; and electrical. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Commonwealth of Massachusetts is soliciting Statements of Qualifications (SOQs) for a comprehensive construction procurement covering multiple specialized trades (e.g., general contracting, masonry, roofing, HVAC, plumbing, electrical, elevator, fire protection, flooring, painting, and related trades). Interested contractors must submit SOQs by January 9, 2026 to be considered for pre-qualification for future contract awards across these disciplines.
Posted Date
Dec 3, 2025
Due Date
Jan 10, 2026
Release: Dec 3, 2025
Close: Jan 10, 2026
The Commonwealth of Massachusetts is soliciting Statements of Qualifications (SOQs) for a comprehensive construction procurement covering multiple specialized trades (e.g., general contracting, masonry, roofing, HVAC, plumbing, electrical, elevator, fire protection, flooring, painting, and related trades). Interested contractors must submit SOQs by January 9, 2026 to be considered for pre-qualification for future contract awards across these disciplines.
Premium
Access the largest public sector contact database
The City of Muscatine is undertaking a major renovation project to update the Water and Resource Recovery Facility (WRRF) electrical systems, replace various sludge pumps, and perform other modifications. The project will also replace or update electrical systems at five lift stations and add access platforms, new wet well cover, and miscellaneous valve/piping work at the Isett Lift Station. The project is being financed by Iowa’s Clean Water State Revolving Fund (SRF) and the Construction Manager at Risk (CMAR) will need to conform to SRF requirements.
Posted Date
Dec 10, 2025
Due Date
Dec 24, 2025
Release: Dec 10, 2025
Close: Dec 24, 2025
The City of Muscatine is undertaking a major renovation project to update the Water and Resource Recovery Facility (WRRF) electrical systems, replace various sludge pumps, and perform other modifications. The project will also replace or update electrical systems at five lift stations and add access platforms, new wet well cover, and miscellaneous valve/piping work at the Isett Lift Station. The project is being financed by Iowa’s Clean Water State Revolving Fund (SRF) and the Construction Manager at Risk (CMAR) will need to conform to SRF requirements.
AvailableThe Wyoming State Construction Department requests Statements of Qualifications (SOQs) from professional service providers across multiple disciplines including architecture, engineering, surveying, and related services. Approved SOQs will be kept on file for two years, multiple firms may be selected, submissions can be made any time, and the state is not obligated to award a contract.
Posted Date
Jan 2, 2025
Due Date
Dec 31, 2025
Release: Jan 2, 2025
Close: Dec 31, 2025
The Wyoming State Construction Department requests Statements of Qualifications (SOQs) from professional service providers across multiple disciplines including architecture, engineering, surveying, and related services. Approved SOQs will be kept on file for two years, multiple firms may be selected, submissions can be made any time, and the state is not obligated to award a contract.
AvailableThe Town of Gilbert, Arizona, seeks qualified Architecture/Engineering firms for a Construction Manager at Risk project involving the design and construction of phases 2 and 3 of the Advocacy Center adjacent to the Public Safety Complex. Phase 2 includes a 31,000 sq ft building for police and support functions, while Phase 3 involves a 6,000 sq ft multipurpose space.
Posted Date
Nov 15, 2025
Due Date
Dec 23, 2025
Release: Nov 15, 2025
Close: Dec 23, 2025
The Town of Gilbert, Arizona, seeks qualified Architecture/Engineering firms for a Construction Manager at Risk project involving the design and construction of phases 2 and 3 of the Advocacy Center adjacent to the Public Safety Complex. Phase 2 includes a 31,000 sq ft building for police and support functions, while Phase 3 involves a 6,000 sq ft multipurpose space.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis