Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Yarmouth
The Town of Yarmouth (Department of Public Works) is soliciting contractors to perform Chase Brook Park restoration and construct a pedestrian bridge, including removal of existing brick walkways and vegetation, site grading, timber pile installation for the bridge, planting, installation of benches/picnic tables, and bank stabilization using coir logs. The solicitation is an open market public works procurement; bidders should be prepared to submit technical and cost proposals and demonstrate experience in park restoration, landscape, and bridge construction.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Yarmouth Police Department
Chase Brook Park restoration and pedestrian bridge project. Removal of brick walk way, trees, vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic tables, & more
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Yarmouth Police Department
Close: Dec 19, 2025
Chase Brook Park restoration and pedestrian bridge project. Removal of brick walk way, trees, vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic tables, & more
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Warren
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
City of Warren
Close: Dec 12, 2025
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
AvailableCity of Irvine
The work to be performed shall include, but not be limited to: storm drain lateral relocation, construction of the bosque pedestrian-bike bridge, construction of median curb and gutter, striping, and other items
Posted Date
Nov 26, 2025
Due Date
Dec 29, 2025
Release: Nov 26, 2025
City of Irvine
Close: Dec 29, 2025
The work to be performed shall include, but not be limited to: storm drain lateral relocation, construction of the bosque pedestrian-bike bridge, construction of median curb and gutter, striping, and other items
AvailableCabrillo College
The owner seeks a collaborative design build firm for the purposes of renovation of the pedestrian bridge. Restore the bridge to full functionality, noting DSA confirmed a full structural retrofit would not be required. Maintain consistent specs and finishes; avoid elevators and chair lifts, reducing mechanical/electrical scope as much as possible; reduce future maintenance requirements; tie into the existing campus and limit impact to the site; meet all DSA requirements, including ADA codes; provide an efficient design-build process which meets an established design and construction budget.
Posted Date
Oct 31, 2025
Due Date
Dec 12, 2025
Release: Oct 31, 2025
Cabrillo College
Close: Dec 12, 2025
The owner seeks a collaborative design build firm for the purposes of renovation of the pedestrian bridge. Restore the bridge to full functionality, noting DSA confirmed a full structural retrofit would not be required. Maintain consistent specs and finishes; avoid elevators and chair lifts, reducing mechanical/electrical scope as much as possible; reduce future maintenance requirements; tie into the existing campus and limit impact to the site; meet all DSA requirements, including ADA codes; provide an efficient design-build process which meets an established design and construction budget.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →