Work includes approx 4,909.5 LF of Full Depth Saw Cutting, removal of 3,461.5 LF of Curb & Gutter, 105,831.0 SF of Asphalt Pavement, and 9,800.0 SF of Concrete Sidewalk/Driveway, as well as surface milling consisting of 12,164.0 SF of Concrete and 482,184.0 SF of Asphaltic Surface Milling (including butt joints at driveways). Earthwork and base stabilization activities comprise 6,316.6 CY of Excavation Below Subgrade (EBS), supported by 10,418.9 TON of 3" Select Crushed material and 2,315.3 TON of 1-1/4" Crushed Limestone as needed. Reconstruction efforts involve placing 3,461.5 LF of Concrete Curb & Gutter 30-Inch Type K, 466.6 LF of Concrete Curb Pedestrian, 7,670.0 SF of Concrete Sidewalk 4-Inch, 1,032.0 SF of Concrete Driveway Approach 6-Inch (both flatwork items including dense base aggregate), and 942.0 SF of Curb Ramp Detectable Warning Fields (Truncated Domes). Asphalt paving requires 1,053.3 TON of HMA Pavement, 3 LT 58-28 S (Base Course) and 7,832.5 TON of HMA Pavement, 5 LT 58-28 S (Surface Course). Utility and finish work include the Adjustment of 96.0 EA Manhole, Catch Basin, and Inlet Frames, supplying and installing 10.0 EA Neenah R-1710 MH Castings (with locking, non-rocking type B lids and up to 12" new adjusting rings), site restoration over 18,755.5 SF of Dirt and Seed Restoration (4" topsoil), and pavement markings consisting of 116.0 LF of Stop Bar, 7,358.5 LF of 4" Yellow, and 304.0 LF of 6" White lines.
Available