Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform a full upgrade of the men's and women's locker rooms and exterior painting of facility. The project consists of renovation work at the Central Treatment Plant (CTP), Building A. The scope includes a full upgrade of the men's and women's locker rooms, encompassing demolition of existing finishes and fixtures, installation of new lockers, plumbing fixtures, tile, lighting, and associated architectural and MEP (mechanical, electrical, plumbing) improvements. Additionally, the project includes surface preparation and exterior painting of the building to enhance aesthetics, durability, and protection of the existing metal siding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide water treatment plant renovation.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Provide water treatment plant renovation.
AvailableThe project includes: Contract I - Additions to the existing water treatment plant including construction of a new control building, chemical feed systems and structures, Rapid Mix Structures, Clearwell, and High Service Pump Station, along with all related building, site, piping, electrical and other associated modifications. Contract II - Additions to the existing water treatment plant including construction of a new Full Scale Pilot filtration system, including demolition, renovation, excavation, backfill, structures, piping, drains, and appurtenances, electrical, mechanical and other associated modifications.
Posted Date
Nov 8, 2025
Due Date
Jan 22, 2026
Release: Nov 8, 2025
Close: Jan 22, 2026
The project includes: Contract I - Additions to the existing water treatment plant including construction of a new control building, chemical feed systems and structures, Rapid Mix Structures, Clearwell, and High Service Pump Station, along with all related building, site, piping, electrical and other associated modifications. Contract II - Additions to the existing water treatment plant including construction of a new Full Scale Pilot filtration system, including demolition, renovation, excavation, backfill, structures, piping, drains, and appurtenances, electrical, mechanical and other associated modifications.
DESIGN-BUILD Work includes central services building renovation.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
DESIGN-BUILD Work includes central services building renovation.
AvailableSewage treatment plant roof replacement at generator building. Project will include the removal and replacement of the General Building upper and lower roofs at the Butterworth STP including the replacement of the tectum deck with steel deck.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Sewage treatment plant roof replacement at generator building. Project will include the removal and replacement of the General Building upper and lower roofs at the Butterworth STP including the replacement of the tectum deck with steel deck.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis